S1 Agile V2.1 - The Best Way to Manage Your MiCOM P40 Agile Relays
S1 Agile V2.1 Download: A Guide for MiCOM P40 Agile Relays Users
If you are a user of MiCOM P40 Agile relays, you might be wondering how to download and use the latest version of S1 Agile, the universal IED engineering toolsuite for these devices. In this article, we will explain what S1 Agile is, why you need it, how to download and install it, and how to use it for configuration and maintenance of your MiCOM P40 Agile relays.
What is S1 Agile and why do you need it?
S1 Agile is a powerful, free of charge, PC toolsuite that provides users with access to all automation IED configuration and record data. It is designed specifically for MiCOM P40 Agile relays, which are GE's advanced protection, control, measurement, monitoring, and communication devices for transmission, distribution, and industrial applications.
s1 agile v2.1 download
S1 Agile: A universal IED engineering toolsuite for MiCOM P40 Agile relays
S1 Agile is the truly universal IED engineering toolsuite for MiCOM P40 Agile relays. It supports all existing MiCOM P40 Agile ranges, including legacy products such as K-series and Modulex, and includes a utility for automatic conversion of setting files from previous generations of numerical relays to the latest P40 Agile models.
S1 Agile is presented as "tiles" rather than menu items to provide a more intuitive user experience. All tools are assembled in a palette for simple entry, with intuitive navigation via a few mouse-clicks. Some of the main tools in S1 Agile are:
Integrated configuration and monitoring features
Send and extract setting files
Event and disturbance record extraction and analysis
Integrated programmable curve tool
Redundant Ethernet configuration
Remote HMI and topology tools for busbar schemes
Benefits of using S1 Agile for configuration and maintenance of MiCOM P40 Agile relays
By using S1 Agile, you can enjoy the following benefits:
Optimum management of the installed base, structured as per the substation topology
Intuitive and versatile interface with file management facilities
Logical structure based on substation, voltage level, and bay
Version control and cross-checking facilities for IED settings
Real-time measurement visualization
Easy conversion of setting files from older relay models to MiCOM P40 Agile relay equivalents
No loss of functionality, device support, or compatibility with your system architecture
How to download and install S1 Agile How to download and install S1 Agile V2.1
If you want to use S1 Agile V2.1 for your MiCOM P40 Agile relays, you need to download and install it on your PC. Here are the steps to do that:
System requirements and compatibility
Before you download and install S1 Agile V2.1, you need to make sure that your PC meets the minimum system requirements and that your MiCOM P40 Agile relays are compatible with this version of the software.
s1 agile engineering tool suite download
s1 agile v2.1 release notes
s1 agile v2.1 user guide
s1 agile v2.1 software request
s1 agile v2.1 installation guide
s1 agile v2.1 update
s1 agile v2.1 license
s1 agile v2.1 tutorial
s1 agile v2.1 manual
s1 agile v2.1 support
s1 agile v2.1 features
s1 agile v2.1 compatibility
s1 agile v2.1 requirements
s1 agile v2.1 free download
s1 agile v2.1 trial version
s1 agile v2.1 demo
s1 agile v2.1 review
s1 agile v2.1 benefits
s1 agile v2.1 troubleshooting
s1 agile v2.1 faq
s1 agile v2.1 forum
s1 agile v2.1 feedback
s1 agile v2.1 training
s1 agile v2.1 certification
s1 agile v2.1 webinar
s1 agile v2.1 online course
s1 agile v2.1 video tutorial
s1 agile v2.1 documentation
s1 agile v2.1 tips and tricks
s1 agile v2.1 best practices
s1 agile v2.1 comparison
s1 agile v2.1 alternatives
s1 agile v2.1 testimonials
s1 agile v2.1 case studies
s1 agile v2.21 upgrade
how to use s1 agile v2.21
how to install s11agilev21
how to configure micom p40 withs11agilev21
how to convert k-series settings withs11agilev21
how to extract event and disturbance records withs11agilev21
how to program curves and redundant ethernet withs11agilev21
how to access remote hmi and topology tools withs11agilev21
how to optimize the performance ofs11agilev21
how to troubleshoot common issues withs11agilev21
how to contact ge grid solutions for support ons11agilev21
The minimum system requirements for S1 Agile V2.1 are:
Operating system: Windows 7, 8, 8.1, or 10 (32-bit or 64-bit)
Processor: Intel Core i3 or equivalent
Memory: 4 GB RAM
Hard disk space: 10 GB free
Display: 1024 x 768 resolution or higher
Internet connection: Required for downloading and updating the software
USB port: Required for connecting to MiCOM P40 Agile relays
The MiCOM P40 Agile relays that are compatible with S1 Agile V2.1 are:
P14x, P24x, P34x, P44x, P54x, P64x, P74x, P94x series
P841, P842, P843 series
P545, P546, P547 series
P821, P822 series
P849 series
P59x series
P63x series
P99x series
K-series and Modulex (with automatic conversion of setting files)
Downloading S1 Agile V2.1 from GE Grid Solutions website
To download S1 Agile V2.1 from GE Grid Solutions website, you need to follow these steps:
Go to the on GE Grid Solutions website.
Click on the "Contact form" link at the bottom of the page.
Fill in the required information and select "Get product support" as your area of interest.
In the details of your request, specify that you want to receive S1 Agile V2.1 by download.
Click on the "Contact Me" button to submit your request.
You will receive an email from GE Grid Solutions with a link to download S1 Agile V2.1 and a license key to activate it.
Installing S1 Agile V2.1 on your PC
To install S1 Agile V2.1 on your PC, you need to follow these steps:
Click on the link in the email from GE Grid Solutions to download the S1 Agile V2.1 setup file.
Save the file to a location of your choice on your PC.
Double-click on the setup file to launch the installation wizard.
Follow the instructions on the screen to complete the installation process.
When prompted, enter the license key that you received in the email from GE Grid Solutions to activate S1 Agile V2.1.
Restart your PC if required.
Congratulations! You have successfully downloaded and installed S1 Agile V2.1 on your PC. How to use S1 Agile V2.1 for MiCOM P40 Agile relays
Now that you have downloaded and installed S1 Agile V2.1 on your PC, you can start using it for configuration and maintenance of your MiCOM P40 Agile relays. In this section, we will give you an overview of the main features and functions of S1 Agile V2.1 and show you how to perform some common tasks with it.
Overview of the main features and functions of S1 Agile V2.1
S1 Agile V2.1 has a user-friendly interface that allows you to access all the tools and functions you need for your MiCOM P40 Agile relays. The main screen of S1 Agile V2.1 is divided into four areas:
The menu bar at the top, where you can access the file, edit, view, tools, help, and language options.
The project explorer on the left, where you can create and manage projects and substation structures, as well as view the status and properties of your connected devices.
The workspace on the right, where you can open and edit setting files, event and disturbance records, programmable curves, and other documents.
The status bar at the bottom, where you can see the progress and messages of your actions, as well as the connection status and mode of your devices.
You can customize the layout of the screen by resizing, docking, or undocking the different areas. You can also switch between different views by using the tabs at the bottom of the workspace.
How to create and manage projects and substation structures in S1 Agile V2.1
A project in S1 Agile V2.1 is a collection of files and folders that are related to a specific substation or application. A project can contain one or more substation structures, which are logical representations of the physical layout and connections of your devices in a substation.
To create a new project in S1 Agile V2.1, you need to follow these steps:
Click on the "File" menu and select "New Project".
Enter a name and a description for your project.
Select a location on your PC where you want to save your project.
Click on the "Create" button to create your project.
To create a new substation structure in S1 Agile V2.1, you need to follow these steps:
Select your project in the project explorer and right-click on it.
Select "New Substation Structure".
Enter a name and a description for your substation structure.
Select a voltage level for your substation structure.
Click on the "Create" button to create your substation structure.
To add devices to your substation structure in S1 Agile V2.1, you need to follow these steps:
Select your substation structure in the project explorer and right-click on it.
Select "New Device".
Select the type and mo